{"id":4545,"date":"2010-03-15T07:36:52","date_gmt":"2010-03-15T07:36:52","guid":{"rendered":"http:\/\/eastjava.com\/blog\/?p=1585"},"modified":"2010-03-15T07:36:52","modified_gmt":"2010-03-15T07:36:52","slug":"gunungsari-dam","status":"publish","type":"post","link":"https:\/\/www.indonesia-tourism.com\/blog\/gunungsari-dam\/","title":{"rendered":"Gunungsari Dam"},"content":{"rendered":"<figure style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.eastjava.com\/tourism\/surabaya\"><img decoding=\"async\" loading=\"lazy\" title=\"dam\" src=\"http:\/\/farm4.static.flickr.com\/3373\/3302531958_e1a74bec2d_o.jpg\" alt=\"Gunungsari Dam - Surabaya\" width=\"600\" height=\"450\" \/><\/a><figcaption class=\"wp-caption-text\">Gunungsari Dam - Surabaya<\/figcaption><\/figure>\n<p><strong><em>New Gunungsari Dam<\/em><\/strong><\/p>\n<p>Purpose<\/p>\n<p>* Provision of raw water for drinking and industrial city of Surabaya for 4.69 m\u00b3 \/ s<br \/>\n* Providing additional water for 1.61 m\u00b3 \/ s for flushing and Kali Kali Mas Wonokromo<br \/>\n* The provision of irrigation water for 12.24 m\u00b3 \/ s<br \/>\n* Flood Control<\/p>\n<p>Hydrology Data<\/p>\n<p>* Debit flood plan: 370.00 m\u00b3 \/ sec.<br \/>\n* El. flood water level u \/ s: El. 4.60 SHVP<\/p>\n<p>Main Dam<\/p>\n<p>* Type: Dams concrete with steel doors<br \/>\n* Length of dam: 77.20 m<br \/>\n* High dam: 7.50 m<br \/>\n* El. threshold dam: El. 0.15 SHVP<br \/>\n* El. top of dam: El. 7.65 SHVP<br \/>\n* Number of doors: 5 fruit Roller gate size 4.75 x 14.30 m by 4 pieces for flood control and measures 5.75 x 8.00 m 1 fruit for exploitation.<br \/>\n* Apron: length 77.20 m, width 12 m (d \/ s), 5 m (u \/ s)<\/p>\n<p>More info visit: <a href=\"http:\/\/www.surabaya.eastjava.com\"> www.surabaya.eastjava.com <!-- a--><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>New Gunungsari Dam Purpose * Provision of raw water for drinking and industrial city of Surabaya for 4.69 m\u00b3 \/ s * Providing additional water for 1.61 m\u00b3 \/ s for flushing and Kali Kali Mas Wonokromo * The provision of irrigation water for 12.24 m\u00b3 \/ s * Flood Control Hydrology Data * Debit flood plan: 370.00 m\u00b3 \/ sec. * El. flood water level u \/ s: El. 4.60 SHVP Main Dam * Type: Dams concrete with steel doors * Length of dam: 77.20 m * High dam:&hellip;<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1028],"tags":[1133,933,1862,1706,6,137],"gutentor_comment":0,"_links":{"self":[{"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/posts\/4545"}],"collection":[{"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/comments?post=4545"}],"version-history":[{"count":0,"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/posts\/4545\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/media?parent=4545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/categories?post=4545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.indonesia-tourism.com\/blog\/wp-json\/wp\/v2\/tags?post=4545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}